Low-volume electronics manufacturing for your first 100 to 1,000 units.
Anvol, Inc. takes low-volume electronics manufacturing orders of 100 to 1,000 units that large EMS companies usually turn down: there is no minimum order, each quantity is quoted on its own after we review your files, boards are assembled on partner SMT lines in China, and every unit is tested before it is packed. Anvol, Inc. is a Delaware company; engineering and small batches run in Beijing and Hangzhou, and larger runs are built with partner factories in Shenzhen and Suzhou. Our largest published client run is 80 units of a Jetson-based field system after a $100,000 development project; other client batches were 50, 50 and 47 units. You sign with Anvol, Inc. and pay in USD.
Updated
Who takes 100 to 1,000 electronics units when large EMS companies will not?
Large EMS companies plan around long runs: a line setup, a fixture and a program pay back over thousands of boards, so on a few hundred units the setup is a large share of the cost. Anvol takes that order. We manage the whole run under one contract: parts sourcing, board assembly on partner lines, enclosures, firmware flashing, final assembly and a functional test on every unit, then a packed shipment with a batch record. If you only need bare boards assembled from finished Gerber and BOM files, an online board-assembly service is cheaper and faster.
Client batches we have built
| Build | Units | Development | Parts per unit | Time |
|---|---|---|---|---|
| Jetson-based field data system for a university research team | 80 units, follow-on production | $100,000 | About $3,500 (estimate) | About 6 months to the tested prototype |
| Portable Jetson field workstation for a university research team | 50 units, follow-on production | $80,000 | About $3,000 (estimate) | About 5 months to the verified prototype |
| ESP32-S3 intercom with custom RF | 50 sets | $8,000 | $150 | 40 days, prototype to batch |
| AI pet mini arcade | 47 sets delivered | $14,420 | $80 | 6 weeks |
| Micro pump driver board and door-lock motor | Small batch delivered | $9,000 | About $25 at 100 units (estimate) | About 2 months |
| Lidar robot car with custom control board | Small batch delivered | Not published | Not published | One month |
All are paid client projects; clients are not named. Estimates are our engineers' figures from the project quote, not invoices.
What we have not shown yet
We have not published a run of 100 or more units. A 100 to 1,000-unit run is quoted from your BOM, test plan and quantity, not stretched from the batch figures above.
Where it is built
- Boards
- Fabricated and assembled on partner PCB and SMT lines in China, ordered and managed by Anvol. Inside the partner factories: the process photos.
- Small batches
- Final assembly, firmware flashing and testing by our team in Beijing and Hangzhou.
- Larger runs
- Built with partner factories in Shenzhen and Suzhou. Which site builds a 100 to 1,000-unit run is decided per project and written into the scope.
- Your contract
- With Anvol, Inc., a Delaware company, in USD. Factory names are not shared; the scope says who does what where. We are building a network of US engineering and manufacturing partners; it is not part of our current capacity yet.
How long a run takes
Four of the client batches above took one month to about two months from the start of development to delivered units; the two Jetson systems took 5 to 6 months of engineering before their 50 and 80-unit runs. For a design that already works, the run date is set by parts lead time, quantity and test time, and it is written into the scope after the file review. Long-lead parts are named in the quote.
How a quote is made
- What to send
- Gerber, BOM and CAD files, or a working sample, plus the quantities you want priced and a target date. We sign an NDA before we open any file.
- First reply
- Within 12 hours, listing what is missing. The first review is not a charge.
- Quantity lines
- Ask for 100, 500 and 1,000 units with the same inclusions. One-time costs (board-assembly setup, fixtures, any mold or development) are listed apart from the unit price, so you can see what each adds per unit. Details: what drives unit cost.
- Enclosures
- At 100 units a printed, machined or cast enclosure is usually cheaper than a mold; in our engineers' worked example a $4,000 mold plus $2 a part only beats a $15 printed or cast part above about 300 units.
How a run works
- First article
- One unit built from the production parts and checked against your approved sample before the batch starts.
- Fixtures and tests
- Agreed with you before the run; every unit is tested before it is packed, with a test fixture when the quantity justifies one.
- Records
- Each unit's test recorded and a batch record with every batch; serial numbers when you need them.
- Part substitutions
- Need your approval before the part is used.
- Reorders
- Built again from the same records, quoted for the new quantity.
Not included
- Certification testing (FCC/CE)
- Done by a test lab and quoted separately when a product needs it.
- Shipping and import duties
- Usually arranged by you once units leave the factory.
- Fulfillment
- Warehousing and per-order shipping are not a standard service yet.
Questions
Anvol, Inc. does: no minimum order, each quantity quoted on its own after a file review, boards assembled on partner SMT lines in China, every unit tested. Our largest published client run is 80 units; other client batches were 50, 50 and 47 units.
No. We also build single prototypes and pilots of 10 to 50 units. Quantity changes the price per unit, not whether we take the order.
Yes, with the same inclusions in each line, so you can see what the setup charges and fixtures add per unit at each quantity.
Often not. In our engineers' worked example a $4,000 mold plus $2 a part only beats a $15 printed or cast enclosure above about 300 units, so at 100 units a printed, machined or cast enclosure is usually cheaper. A mold is quoted separately when you want one.
No. FCC/CE testing is done by a test lab and quoted separately when a product needs it.
Related: small batches of 10 to 100 → · China OEM/ODM first order → · low-volume robotics → · testing and release →