A DFM review for a robot before the first production run

Anvol does it as part of taking a prototype to its first batch: our engineers check parts and BOM alternatives, board assembly, the enclosure process and test fixtures, build a first article on the partner line and fix what it shows before any batch. A quick feasibility check is free; a detailed engineering review is scoped and quoted on its own.

Updated

What we check

Parts and BOM
Every part sourced and checked, including older and hard-to-find chips; BOM cleanup with approved alternative parts.
Boards
Board type, layer count and assembly type matched to a partner line that runs that process; hand assembly or PCBA chosen per board and quantity.
Enclosure and structure
Which process fits the quantity: 3D printing while the design moves, CNC for metal and precise parts, vacuum casting for small runs, injection molds when the volume pays for them.
Assembly
Inserts, bonding, cable harnesses and connectors, and the order parts go in.
Test
How each unit is tested and recorded, and whether the run needs a test fixture.
First article
One unit built on the line and checked against your approved prototype; design-for-manufacturing fixes made before the batch.

Robots we have taken through it

BuildUnits and unit costDevelopmentDevelopment time
Lidar line-following carDelivered: 10 at $150 each$5,0001 month
Six-legged robotParts $180 per set at 10 sets$5,00020 days
Voice-controlled quadrupedParts $200 per unit at 15 sets$5,00020 days
Wheel-legged balancing robotParts about $150 per set at 20 sets$5,00020 days
ROS 2 omnidirectional robotParts about $800 per unit at 50 sets$4,50018 days

Reference figures are our engineers' numbers for a similar build, not invoices or quotes. Only the lidar car is a delivered price.

What you send

Schematics and PCB files, BOM, firmware, CAD, photos or video of the working unit, known bugs and test results, target quantity, markets and date. If you have a working prototype, we review what you have and quote only the gap.

Not included

Certification testing (FCC/CE)
Done by a test lab and quoted separately when a product needs it.
Shipping and import duties
Usually arranged by you once units leave the factory.
Changes outside the written scope
Re-quoted, with a new timeline, before work continues.

Related: testing and release → · where each step happens → · project evaluation → · low-volume robotics runs →