Will you own the schematics, PCB files, firmware and CAD?
Yes: with Anvol, Inc. you own the project-specific design files, drawings and tooling, you receive the schematics, PCB files, firmware source and enclosure CAD, and we sign a mutual NDA before we open any file. Below: what the NDA covers, who owns what, and the files you take with you.


NDA
- Before any file
- We sign an NDA before we open anything you send.
- Both ways
- It is mutual: it covers what you send us and what we send you.
- Partner lines
- We share your files with a partner line only to quote or build, and only under a written confidentiality obligation at least as protective as your NDA. What to check with any team in China →
Who owns the design, and what stays ours
- Your design
- You own the project-specific design files, drawings and tooling.
- Our tools
- Anvol's general tools and libraries stay ours.
- Third-party parts
- Third-party and open-source components keep their original licenses.
The files you receive: schematics, PCB, firmware source, CAD
- Electronics
- Schematic, PCB files, Gerbers, BOM with sources.
- Firmware
- Firmware source, factory test program, protocol and API notes.
- Mechanical
- Enclosure CAD files.
- Testing
- Test checklist, test report, test videos.
- Production
- Production files, and a batch record for each batch.
- When
- Design files come with the working prototypes; production files come with the tested units.
- Which of these
- The ones for the services in your written scope, which lists every deliverable before work starts.
Guide: production handover, the files, test specs and golden samples you should receive
A design can only move to another line, or be built again a year later, if the handover package is complete. This is what a complete package holds, and what to check before you accept it.
- Electronics
- Schematic source and PDF, PCB source, Gerbers and drill files, the pick-and-place file and assembly drawing, and the BOM with manufacturer part numbers, sources and any approved alternates.
- Firmware
- Source, the toolchain and build instructions, the released binary with its version number, and the programming procedure the line uses.
- Mechanical
- 3D models in STEP and native format, 2D drawings with the critical dimensions and tolerances, and, if a mold was made, who owns it and where it is kept.
- Test specification
- The functional test with its pass/fail limits, the test program or firmware, and the drawings of any jig or fixture.
- Production
- Work instructions in assembly order, the packaging specification, and the batch record of each batch built.
- Golden samples
- Approved units from the first article or the pilot, signed off by you, kept as the reference the next batch is compared with. How many there are and who keeps them goes in the scope.
- Check before you accept
- A second engineer builds the firmware from source and gets the released version; the BOM matches the boards in your hands; the Gerbers match the released revision; the test specification runs on a golden sample and passes.
- When
- Design files come with the working prototypes; production files come with the tested units. Which files are included follows the services in your written scope.
Changes
- Parts and scope
- How part substitutions and scope changes are approved →